Bigrick31 silverado box construction log

ok 3rd layer is done!!!! ive gone through 1.25 gallons of resin already and close to 50sq ft of mat. ill have to stock up when i get ready to add the mdf ring in. and i guess ill use some cheese cloth to get the beginning shape. so just one more layer on the inside and that should be good and sturdy!!!

 
Picture040-1.jpg


1" mdf ring 2 layers thick for a flush look.

Picture041.jpg


box out of the truck

Picture042-1.jpg


Picture043.jpg


mock up of how the sub will sit

 
a lot of the flece will be cut back and the dowls removed to make way for the top of the box. looks a little rough right now but it will get cleaned up later.

 
Activity
No one is currently typing a reply...
Old Thread: Please note, there have been no replies in this thread for over 3 years!
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

About this thread

Bigrick31

10+ year member
Carpe Diem
Thread starter
Bigrick31
Joined
Location
Mid*Cal
Start date
Participants
Who Replied
Replies
77
Views
7,250
Last reply date
Last reply from
KINGDELL91
IMG_20260516_193114554_HDR.jpg

sherbanater

    May 16, 2026
  • 0
  • 0
IMG_20260516_192955471_HDR.jpg

sherbanater

    May 16, 2026
  • 0
  • 0

New threads

Top