x2 as a builder if I mess up thats my fault and I pay for my mistake...same goes for any businessLooks like a fairly legit fix, except I'm trying to figure where that crack comes from...But I don't see any problem with that box but you should NOT pay that extra $30 he charged to fix it, I would ask him for that back since he made the mistake.
I've made that same mistake before and told my guy straight up that I messed up the cut, let me double baffle it for ya and it'll be even stronger then before, and didn't charge him any more.
the crack comes from where he ****ed up the cut then had to move it over a bit and fill that part in.Looks like a fairly legit fix, except I'm trying to figure where that crack comes from...But I don't see any problem with that box but you should NOT pay that extra $30 he charged to fix it, I would ask him for that back since he made the mistake.
I've made that same mistake before and told my guy straight up that I messed up the cut, let me double baffle it for ya and it'll be even stronger then before, and didn't charge him any more.
and its 2 sheets its thick as shit on 3/4ths of it.lolThat box doesn't seem like 2 sheets of mdf. Should of saved some money and done it your self. At the most paid him for a blue print. But that's just stating the obvious.
i meant on about 3/4ths of the whole cutuout and its 1 1/2 inches thick..LOL!!
ya it didnt take no dam sheet for the whole top..Ask him were all your extra wood is. He could of at least double baffle the whole thing if he had enough wood left over. Which i'm pretty sure he does.
I built a box in 2.5 hours(first box too) and it looked nicer than that by a lot. It was very well done tho. But still if my first box, built same day, looked better than that, you need to figure something out with that guy.yes on homemade boxes mabey..
its gay cause if u go on this guys site,there is some quality shit on there and really nice boxes. and alot of people that signed on the little guestbook thing that he makes nice shit and i know he doesWOW!! Deff ask hem for the rest of your wood. Or tell him to double baffle the whole thing. I figure he finished the whole box, port included, but made the front first. Maybe forgetting about the port. So then he milks you for the charges for a whole sheet of mdf, And all he had to make is the front. He can easily wrap the box one more time with all the left over wood.
lolMaybe shoulda gone with me?
//content.invisioncic.com/y282845/emoticons/wink.gif.608e3ea05f1a9f98611af0861652f8fb.gif