3 weeks i think was within a month lol . all that you have to do is seperate the front and back waves look at that link i put up there? basiocally ib can be a 1 sided box outside of the sides needed to make the seal. not very hard to do at all
3 weeks i think was within a month lol . all that you have to do is seperate the front and back waves look at that link i put up there? basiocally ib can be a 1 sided box outside of the sides needed to make the seal. not very hard to do at all