Whats the build/ship time on SSA subs

  • 4
    Participant count
  • Participant list
As stated on the product pages on the SSA Store, there is an average 21 business day lead time. Occasionally the build house can get ahead of schedule. The CNC machining of the motor/solid pole (cooling channels), takes time. They are absolutely worth the minor wait time for the price paid. //content.invisioncic.com/y282845/emoticons/smile.gif.1ebc41e1811405b213edfc4622c41e27.gif

 
Anything Scott and Nick turn out is great, If your impatient this isnt the company for you. But if you want the best in the business the order away

 
Did my first recone with an icon 15.. Very pleased with the product!! Probably the best money I've spent in a while, beside finding an alpine cda7893 NIB on eBay for $63! haha.

 
Activity
No one is currently typing a reply...
Old Thread: Please note, there have been no replies in this thread for over 3 years!
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

Similar threads

I don't think this is ideal, but let's assume you can easily mount all the tweeters. That installing them is going to be really simple, and...
13
883
In this Bidenconomy it is worth around $13,634. And a loaf of bread.
3
1K
I think your front stage is spot on. If your DSP has a dongle that connects to your phone, then you are getting the full clear signal. No need to...
22
2K
You could run that sub on a 4 channel amp and have 2 channels left for amping front speakers. I just put a small system in my brothers car with a...
16
3K

About this thread

The Camry

Hey, I Try.
Thread starter
The Camry
Joined
Location
Western Oregon
Start date
Participants
Who Replied
Replies
5
Views
588
Last reply date
Last reply from
tc300
IMG_1154.png

GoldCountryCA

    May 5, 2024
  • 0
  • 0
IMG_1153.png

GoldCountryCA

    May 5, 2024
  • 0
  • 0

Latest topics

Top