I'm building my box now I can't wait to get my Machete jamming my 18"s tho those 32" are friggin beautiful!!!!!!!!!!! Can't wait to see the finished product!
With the first baffle secure, we made the 3 additional baffles so that the subs will mount onto 4 layers. As you can tell, it's a pretty long enclosure with Adam laying in it LOL. We reinforced the baffles with (3) 2x4 in the middle of each cut section with an additional and (12) 2x4 on both sides of each cut section. Seems to be pretty **** strong. 1" trim pieces were also added to ensure full sealed chamber. These trim pieces will be sanded and smoothed in case anyone was wondering. Lastly, we continued to work on the loading wall building it up to about .5" below the baffles. You'll see why we're doing this shortly.*
Few small updates. We finished the front wall where the loading wall will sit. It's 6" thick and isn't going anywhere. Of course, we had to test fit one of these things to make sure the motor wouldn't hit our 45-degree angle floor. We managed to get one to sit and it cleared it with ease. Loading these things is something else. We also added our back plates (2) sheets. Metal cage will weld around it. The box is coming along. It's almost time for paint.*