I need a 12" L7 06 box made SOON

Look no bullshit im sure this is wut i want im getting my first paycheck monday buyin my box with it. Then next paycheck on the 24th im getting amp and sub. My stepfather going half with me. And if i dont get box with this monday check ima hafta wait for 2 more weeks after the 24th for paycheck to buy the box. So ima get it wit this 1 on MONDAY

 
Activity
No one is currently typing a reply...
Old Thread: Please note, there have been no replies in this thread for over 3 years!
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

About this thread

TheSpeakerMan

10+ year member
Knockin Pics Of da Wall
Thread starter
TheSpeakerMan
Joined
Location
Conway, AR
Start date
Participants
Who Replied
Replies
5
Views
494
Last reply date
Last reply from
dkguitarist
IMG_20260516_193114554_HDR.jpg

sherbanater

    May 16, 2026
  • 0
  • 0
IMG_20260516_192955471_HDR.jpg

sherbanater

    May 16, 2026
  • 0
  • 0

New threads

Top