FlexnInLa 10+ year member
Huggin Them Nuts!
Figured I'd go ahead and start this as bits and pieces are coming in now via UPS, FedEx, and USPS.
Sub stage is 2 15" Obsidians on an ED NINe.1.
Front stage is DLS Reference RM6.2 on an ED NINe.2.
Box build was going to start tonite, but I have to leave town until Friday evening, so box build will start Saturday night, I'll post pics of the drunken shenanigans as they go down. Going to build the box with my ex-step son under the supervision of a pro installer in his shop, so all should go well. Jason, i.e. Moble Enclosurs here, has designed a KILLER box for me, the interesting part is that it looks like we will have to build it IN the trunk, should be fun!
Wish me luck and stay tuned...
Sub stage is 2 15" Obsidians on an ED NINe.1.
Front stage is DLS Reference RM6.2 on an ED NINe.2.
Box build was going to start tonite, but I have to leave town until Friday evening, so box build will start Saturday night, I'll post pics of the drunken shenanigans as they go down. Going to build the box with my ex-step son under the supervision of a pro installer in his shop, so all should go well. Jason, i.e. Moble Enclosurs here, has designed a KILLER box for me, the interesting part is that it looks like we will have to build it IN the trunk, should be fun!
Wish me luck and stay tuned...