Ok the big 3 is considered, power Wire from bat to alt, - from batt to frame, engine block to chassis.
Here's my question, can I do it like this.
I have a mechman 270 alt with ground post.
Ok I done the + from batt to alt already
can I run a cable from the frame to the ground post on the alt then another cable from the same ground post to negative terminal on battery.
Wouldn't that take care of both the battery - to chassis and the chassis to engine block since the factory alt bracket is attached to engine block anyways...
Here's my question, can I do it like this.
I have a mechman 270 alt with ground post.
Ok I done the + from batt to alt already
can I run a cable from the frame to the ground post on the alt then another cable from the same ground post to negative terminal on battery.
Wouldn't that take care of both the battery - to chassis and the chassis to engine block since the factory alt bracket is attached to engine block anyways...