Question on a SQL setup, Tantric SHD

2 g31 batts is a minimum to run one of those at its full potential. But if you wire it low, you better be getting another 1 or 2 of those G31s.

For reference, i ran a 7k amp at .25ohm on 3 75AH batts, 2 Kinetik 600s, and my stock 90ah batt and alt. still dropped to low 13 volts

or another reference is I ran 2 AQ3500s at .25 each with a batcap 8600 and 275amp alt and dropped from 15.2v to 13.5v. clamped about 11k out of them

 
2 g31 batts is a minimum to run one of those at its full potential. But if you wire it low, you better be getting another 1 or 2 of those G31s.
For reference, i ran a 7k amp at .25ohm on 3 75AH batts, 2 Kinetik 600s, and my stock 90ah batt and alt. still dropped to low 13 volts

or another reference is I ran 2 AQ3500s at .25 each with a batcap 8600 and 275amp alt and dropped from 15.2v to 13.5v. clamped about 11k out of them
Correct me if I am wrong, but I am talking 1 ohm max which is going to be drawing alot less power than those rates.

 
still 5k watts at 1ohm. gonna need 2 31s atleast for that. however, if you are going to compete, check out the battery rules for it. if you can get more, wont hurt.

 
Activity
No one is currently typing a reply...
Old Thread: Please note, there have been no replies in this thread for over 3 years!
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

About this thread

Theory

Junior Member
Thread starter
Theory
Joined
Location
Tampa, FL
Start date
Participants
Who Replied
Replies
19
Views
1,897
Last reply date
Last reply from
Theory
IMG_20260516_193114554_HDR.jpg

sherbanater

    May 16, 2026
  • 0
  • 0
IMG_20260516_192955471_HDR.jpg

sherbanater

    May 16, 2026
  • 0
  • 0

New threads

Top