I am planning on running a Kicker ZX350.4 and a ZX750.1 sometime in the next few weeks and I was curious if I should move to 0 gauge power/ground. I currently have the 4 gauge kit from Knu, but I am worried that this will not cut it. Will I be okay to just get a distribution block and split the 4 gauge run?
Edit - I referred to the wire guide sticky, but I always see guys running 0 gauge with ~ 1000rms, so i wanted to make sure.
Edit - I referred to the wire guide sticky, but I always see guys running 0 gauge with ~ 1000rms, so i wanted to make sure.