Is the guy in the yellow shirt Tech 9?Long time customer building a box I designed for 2 x-12's. There will be 2 posts for this one, I received a lot of pics. The box isn't finished yet, there will be more finishing to come.
View attachment 31479
View attachment 31480
This is what it's all about right here: music, friends, and fun.
View attachment 31481
View attachment 31482
View attachment 31483
View attachment 31484
View attachment 31485
View attachment 31486
View attachment 31487
I be soo happy once I’m glueing the lid on, I know That at that point, all the cutting is done and it’s downhill from there.View attachment 31488
View attachment 31489
View attachment 31490
View attachment 31491
View attachment 31492
I think the box is being tested some, it's on low power. Like I say, there is still finishing touches to be made. Hopefully I'll get those pics, too.
I be soo happy once I’m glueing the lid on, I know That at that point, all the cutting is done and it’s downhill from there.
Nice! What vehicle? If you mentioned it, I overlookedThey have it playing. It's only on a full bridge 3k with like no electrical at all right now. We'll have to see how it does under full power, it may be a while until that day. Lots of vehicle work to do.
I kinda figured that would happen buck. Had a feeling the way it was in front would be a problem. Stoked that it is going to the cnc machine very soon.
Also figured that as well that it would have been a ***** to package safely with that front like that. Last thing either of us wants is something to happen in shipping not with all the hard work you, dave and I have done on getting that box done. Especially the two of you doing what you are doing for me. Never expected something like that to happen when you said you needed to talk to me in May asap,lol.