Why that many 12v? You not runnin 16v set up ?
Uh yeah.................ok
stupid question but u payin for all of this? U dont have to answer if u dont want to //content.invisioncic.com/y282845/emoticons/smile.gif.1ebc41e1811405b213edfc4622c41e27.gifAll 4 Alts are being shipped today, and the copper bus bars will be here from ups ground today. So were just about ready.
Internal Box design has to be fixed do to poor loading from the subs giving us a high imp rise but its an easy fix.you keeping the same box?
stupid question but u payin for all of this? U dont have to answer if u dont want to //content.invisioncic.com/y282845/emoticons/smile.gif.1ebc41e1811405b213edfc4622c41e27.gif
Thanks Doug, Im ready to unleash this Silverado monster.I look forward to HEARING the setup complete w/ real life people screaming, running, and covering their ears!!! WOOT!
nice haul Andrew.
what kind of Chemicals? lolCorrect, I pay for every last bit of it....
As my real world job, Im a Chemical Eng.
Highest last year was a 157.8 @ 55hz with the gains on the amps set very conservitive, potentialy a 159.where was the meter?