Dug out ~4' of earth (yard is a hill) Graded the ground. Put the concrete pavers in for the foundation,. It's a 16'x32' above ground. Frame it out, put the walls up, outer posts, and built and tampered up the sand for the liner to sit on. All thats left tomorrow is to put the liner up, and hook up the pumps, plumbing, and electrical. the water truck is coming at three. Not too bad for never even seeing one of these put together, let alone trying to do it. The things I do for family and their friends.