03F150MrSBF 10+ year member
Senior VIP Member
Man I hate to do this and was really hoping I didn't have to.
I had 04Murdalanche (Jeff) do a iPad mini dash for me. This started in February when we talked about it and ordered parts. He offered to help me out and I did it for him in return. After all, this is a hobby and if you can help someone out instead of asking for tons of money then great. And just so I put everything on the table I'll talk about what we helped out on.
-He offered to do my ipad dash. And started the work
- he ran and got me some 1/0 lugs from shop since I work late. (I paid, but he was willing to go so I really appreciated the help)
- offered to help me learn to glass and help with my a-pillars. He didn't do any work on these. But again I really appreciated the offer to help.
-I gave him some shok 1/0 (I think 14ft? For a - run to the back)
. i bought 2 ipad mini bezels from FiField Fab. (He paid me 50 for his and I covered the rest. Was like 6 or 7$ more so no biggie really)
. Made large decals for him for his enclosure in the silverado. And some smaller decal work.
. Gave him some blue LEDs wired up.
. Bought him some Glassing materials.
- resin , mat, and some jelly he wanted to try.
I think that was it but I may have missed some others. Feel free to add to the list Jeff. But keep it honest, and I'm doing my best to do the same.
February.
Got a game plan. Ordered parts. When parts came in we met up and looked at ideas on what we could do and agree on. He took both ipad mini bezels and my complete radio bezel dash. (Ac panels, airbag on/off switch) just so he had everything he needed to make it fit right.
Feb 2
Feb 10
Feb 11
Feb 13
Fast forward
March
April
May
June
July
Aug
Starting from about May, he's been saying he's basically done and should have it out to me no later then next week. Multiple times. I have texts I can include if needed. But I'm just showing work so I didn't include them.
Finally received the dash OCTOBER 5th
(10 pic limit, to be continued)
I had 04Murdalanche (Jeff) do a iPad mini dash for me. This started in February when we talked about it and ordered parts. He offered to help me out and I did it for him in return. After all, this is a hobby and if you can help someone out instead of asking for tons of money then great. And just so I put everything on the table I'll talk about what we helped out on.
-He offered to do my ipad dash. And started the work
- he ran and got me some 1/0 lugs from shop since I work late. (I paid, but he was willing to go so I really appreciated the help)
- offered to help me learn to glass and help with my a-pillars. He didn't do any work on these. But again I really appreciated the offer to help.
-I gave him some shok 1/0 (I think 14ft? For a - run to the back)
. i bought 2 ipad mini bezels from FiField Fab. (He paid me 50 for his and I covered the rest. Was like 6 or 7$ more so no biggie really)
. Made large decals for him for his enclosure in the silverado. And some smaller decal work.
. Gave him some blue LEDs wired up.
. Bought him some Glassing materials.
- resin , mat, and some jelly he wanted to try.
I think that was it but I may have missed some others. Feel free to add to the list Jeff. But keep it honest, and I'm doing my best to do the same.
February.
Got a game plan. Ordered parts. When parts came in we met up and looked at ideas on what we could do and agree on. He took both ipad mini bezels and my complete radio bezel dash. (Ac panels, airbag on/off switch) just so he had everything he needed to make it fit right.
Feb 2
Feb 10
Feb 11
Feb 13
Fast forward
March
April
May
June
July
Aug
Starting from about May, he's been saying he's basically done and should have it out to me no later then next week. Multiple times. I have texts I can include if needed. But I'm just showing work so I didn't include them.
Finally received the dash OCTOBER 5th
(10 pic limit, to be continued)