Next week being March 7th - March 10th.
The following services will be effected.
Live Support
Phone System
With the new web site and all the new product offerings / items coming off pre-production and shipping. We are very very very busy people. Our shop is busting with more product / shipping and orders than we have ever had (THANK YOU!!!).
This does mean one major thing. There is more to do! Specially the following needs to be done.
1. Hundreds of people need to be called yet for cc verification on their pre-production items for 6500s, NINe.4's, 9Kv.2, 11Ov.2, as well as a slew more for backordered items now shipping or in final assembly / QC getting ready to ship.
2. Box Construction. Around a dozen people are waiting on custom enclosures. We need to finish these up.
The live support system and phone system will be chosen specifically becuase at the moment both of them are going insane. When the phone gets picked up, we put down the other line and bam, the other one rings, this is fairly consistent, all day long. Our problem is we are spending so much time on the computer and phone giving product support, order support, and taking orders. We can't get a lot of work done.
The obvious solution is hire someone. We've done that So we're taken care of on that front. They will just need some time to get moved here, and re-adjusted to their surroundings.
Monday - Thursday of next week eD will be open. Our ticket system will be completely open and you can still email us with any questions you may have. We will still spend time throughout the day to answer these obviously.
Friday we will be answering the phones as usual as well as be on the support live system. A LOT of people will get phone calls from someone at Elemental Designs next week so if you've got something on order and paid via cc chances are that you will hear from us.
During this time we are also doing a few things that require a good deal of attention. A few things we are doing is
1. Replacing the shopping cart. This way people will be able to track all their orders online including see tracking #'s, etc etc.
2. Replacing cc processors. So people will not need to get a phone call to confirm pre production sales anymore. It can be done digitally when the change is made.
3. Finishing the package deal engine which will allow anyone at anytime to build their own package deals online , and get the discount.
These things will require a good deal of time / phone calls / programming to get it all going properly.
Next week is going to be a good one I think. We've got palletes full of stuff to QC that is going to grow and grow and grow over the next few weeks. And the entire warehouse needs to be re-organized to boot to accomodate all the v2 lines we've got around.