here's a temporary box i threw together for my 15" mojo until my toxic bass design is complete...powered by a BX1505 until CIA has repaired my Herc.
beginning design:
3.5 cubes tuned to 36ish hz....60 in^2 of port.
pieces cut...
all sides doubled up....
yea i know...a little ghettofied but i was running low on clamps at the time...lol
no build pics because honestly this box wasn't pretty. nor was it meant to be. i just wanted something SOLID that would hold me over until i get the chance to build the ttb design.
finished product...
i know...nasty looking....it had a couple unflush edges and a few split ends from not predrilling far enough as you can see...the bit wasn't long enough for working with doubled baffles...
it might not be clean but it is DEFINITELY the most solid box i've built to date...i think i used more screws and glue in this box than i have in all my other builds combined...lol. its definitely heavier than the others... it's also internally braced with two 2"x4"s.
tomorrow it'll be carpeted, and everything should be installed...vids possibly. //content.invisioncic.com/y282845/emoticons/smile.gif.1ebc41e1811405b213edfc4622c41e27.gif
let me know what you think.
beginning design:
3.5 cubes tuned to 36ish hz....60 in^2 of port.
pieces cut...
all sides doubled up....
yea i know...a little ghettofied but i was running low on clamps at the time...lol
no build pics because honestly this box wasn't pretty. nor was it meant to be. i just wanted something SOLID that would hold me over until i get the chance to build the ttb design.
finished product...
i know...nasty looking....it had a couple unflush edges and a few split ends from not predrilling far enough as you can see...the bit wasn't long enough for working with doubled baffles...
it might not be clean but it is DEFINITELY the most solid box i've built to date...i think i used more screws and glue in this box than i have in all my other builds combined...lol. its definitely heavier than the others... it's also internally braced with two 2"x4"s.
tomorrow it'll be carpeted, and everything should be installed...vids possibly. //content.invisioncic.com/y282845/emoticons/smile.gif.1ebc41e1811405b213edfc4622c41e27.gif
let me know what you think.