sundownz
Pro Seller
Supporting Vendor
Production on the X series is wrapping up; photos below!
Production T/S spec will be coming in soon as well -- likely before the end of this week.
Z v.4 production should complete fairly soon as well; we had some delay on the voice coils as the flat wire is imported from Denmark for those coils.
Either way X and Z v.4 ETA should be within a few weeks of the original end of June time frame.
----------
Photos of the packaging inside of each directory; those images are pretty large (3MB each) so I didn't link them direct in the post.
----------
X-10 :
Index of /misc/protos/X_Series_1250/Production Photos/X10
Production T/S spec will be coming in soon as well -- likely before the end of this week.
Z v.4 production should complete fairly soon as well; we had some delay on the voice coils as the flat wire is imported from Denmark for those coils.
Either way X and Z v.4 ETA should be within a few weeks of the original end of June time frame.
----------
Photos of the packaging inside of each directory; those images are pretty large (3MB each) so I didn't link them direct in the post.
----------
X-10 :
Index of /misc/protos/X_Series_1250/Production Photos/X10
