Menu
Forum
General Car Audio
Subwoofers
Speakers
Amplifiers
Head Units
Car Audio Build Logs
Wiring, Electrical and Installation
Enclosure Design & Construction
Car Audio Classifieds
Home Audio
Off-topic Discussion
The Lounge
What's new
Search forums
Gallery
New media
New comments
Search media
Members
Registered members
Current visitors
Classifieds Member Feedback
SHOP
Shop Head Units
Shop Amplifiers
Shop Speakers
Shop Subwoofers
Shop eBay Car Audio
Log in / Register
Forum
Search
Search titles and first posts only
Search titles only
Search titles and first posts only
Search titles only
Log in / Join
What’s new
Search
Search titles and first posts only
Search titles only
Search titles and first posts only
Search titles only
General Car Audio
Subwoofers
Speakers
Amplifiers
Head Units
Car Audio Build Logs
Wiring, Electrical and Installation
Enclosure Design & Construction
Car Audio Classifieds
Home Audio
Off-topic Discussion
The Lounge
What's new
Search forums
Menu
Reply to thread
Forum
Car Audio Discussion
General Car Audio
My project delay again
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="thylantyr" data-source="post: 1926022" data-attributes="member: 560358"><p>They are magnetic planars, some call them isodynamic planars, the manufacturer</p><p></p><p>calls them 'ribbons' using the term loosely and incorrect, they are not true ribbons</p><p></p><p>like Ravens, etc.</p><p></p><p>This particular design offers the best SQ with SPL of all tweeters I've worked with.</p><p></p><p>There are two other brands in the same league but not available for purchase</p><p></p><p>seperately unless you want to buy the 'system' and remove the tweeters... lol</p><p></p><p>Only compresson drivers with horns can produce more SPL but SQ suffers</p><p></p><p>compare to this tweeter. If you can tolerate a we bit less SPL than a big</p><p></p><p>horn to gain a huge boost in SQ, this is the tweeter to get.</p><p></p><p>Tube geeks would get a boner if they knew it was 13 ohms nominal {high</p><p></p><p>impedance, tube amp friendly}, and 103dB sensitivity. They also sell a waveguide</p><p></p><p>for it to boost sensitivity to 107dB but the frequency response is peaky at some</p><p></p><p>mid frequencies.</p><p></p><p>If you have a wild imagination, imagine 21 tweeters in a 7.1 HT system where</p><p></p><p>the mains are 8 tweeter per tower line arrays with 8" mids and another set</p><p></p><p>of line arrays where you have eight 15" midbass drivers tuned to 35hz,</p><p></p><p>then add a monster high xmax sub(s), everything powered by over ten pro audio amps</p><p></p><p>in bridge mode for ultimate death and punishment.</p></blockquote><p></p>
[QUOTE="thylantyr, post: 1926022, member: 560358"] They are magnetic planars, some call them isodynamic planars, the manufacturer calls them 'ribbons' using the term loosely and incorrect, they are not true ribbons like Ravens, etc. This particular design offers the best SQ with SPL of all tweeters I've worked with. There are two other brands in the same league but not available for purchase seperately unless you want to buy the 'system' and remove the tweeters... lol Only compresson drivers with horns can produce more SPL but SQ suffers compare to this tweeter. If you can tolerate a we bit less SPL than a big horn to gain a huge boost in SQ, this is the tweeter to get. Tube geeks would get a boner if they knew it was 13 ohms nominal {high impedance, tube amp friendly}, and 103dB sensitivity. They also sell a waveguide for it to boost sensitivity to 107dB but the frequency response is peaky at some mid frequencies. If you have a wild imagination, imagine 21 tweeters in a 7.1 HT system where the mains are 8 tweeter per tower line arrays with 8" mids and another set of line arrays where you have eight 15" midbass drivers tuned to 35hz, then add a monster high xmax sub(s), everything powered by over ten pro audio amps in bridge mode for ultimate death and punishment. [/QUOTE]
Insert quotes…
Verification
Post reply
Forum
Car Audio Discussion
General Car Audio
My project delay again
Top
Menu
What's new
Forum list