ok, been awhile since ive updated this semi-build log of what ive been up to. Since ive started my new job working for the Army's IT department, ive had little time to get out and finish my build...but its slowly comming. So here is some build log pics of what ive been up to on this.
First off, I had major problems with RUST. When I pulled the interior out, I found four 4-8" holes - large enough to where I could see my leaf springs thru them. Its amazing that I even got as high as scores as I did with such leaks! .. But what I did is cut out the rust and weld over it, then repainted it with the stock red paint as you can see here. Im letting it dry before I put in the bottom section of the floor wall.
Time to cut wood and start sanding! The wood is standard 3/4" MDF that was purchased at Lowes - nothing spectacular here and no exotic materials this time - at least yet
all walls of the box are 3/4" MDF sandwitched with liquid nails
then they are screwed together quite well (as you can see from my screw farm) and then the edges are sanded so that they mate well with the rest of the structure. Also all the screw holes are filled with wood filler and sanded.
Lets cut some holes! On the faceplate structure of the box, the DD's will have three 3/4" MDF layers for support of the weight. The 12" memphis M3 basket was used as my thinkn' cap
The dog wanted to help //content.invisioncic.com/y282845/emoticons/rolleyes.gif.c1fef805e9d1464d377451cd5bc18bfb.gif