Menu
Forum
General Car Audio
Subwoofers
Speakers
Amplifiers
Head Units
Car Audio Build Logs
Wiring, Electrical and Installation
Enclosure Design & Construction
Car Audio Classifieds
Home Audio
Off-topic Discussion
The Lounge
What's new
Search forums
Gallery
New media
New comments
Search media
Members
Registered members
Current visitors
Classifieds Member Feedback
SHOP
Shop Head Units
Shop Amplifiers
Shop Speakers
Shop Subwoofers
Shop eBay Car Audio
Log in / Register
Forum
Search
Search titles and first posts only
Search titles only
Search titles and first posts only
Search titles only
Log in / Join
What’s new
Search
Search titles and first posts only
Search titles only
Search titles and first posts only
Search titles only
General Car Audio
Subwoofers
Speakers
Amplifiers
Head Units
Car Audio Build Logs
Wiring, Electrical and Installation
Enclosure Design & Construction
Car Audio Classifieds
Home Audio
Off-topic Discussion
The Lounge
What's new
Search forums
Menu
Reply to thread
Forum
Off-topic Discussion
The Lounge
everyone likes papermaker
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="los33" data-source="post: 8564058" data-attributes="member: 660834"><p>So again your basically throwing numbers from your guesses?</p><p></p><p>Carbide, tooling for Mills are not free. A new program or modified program is needed for new cnc adaptation cuts.</p><p></p><p>JUST for a top plate the process is</p><p></p><p>-Roughing</p><p></p><p>-Cutting/shaping (which takes 30mins to an hour)</p><p></p><p>-Fine tooling which requires depending by design drilling, then 8 round, 10 round or GB threading</p><p></p><p>-Skimming to smooth surface</p><p></p><p>-More drilling for poll/coil</p><p></p><p>Not to mention having to re-indicating when swapping from machines.</p><p></p><p>Grinding/smoothing corners/edges, threads.</p><p></p><p>Then Q/A for proper specs as even the slightest mistake will throw off specs.</p><p></p><p>IF it passes then it is ready to move on.</p><p></p><p>You really do not know the process and even a large build house will not waste 1k on that much work.</p><p></p><p>Sent from my Z970 using Tapatalk</p></blockquote><p></p>
[QUOTE="los33, post: 8564058, member: 660834"] So again your basically throwing numbers from your guesses? Carbide, tooling for Mills are not free. A new program or modified program is needed for new cnc adaptation cuts. JUST for a top plate the process is -Roughing -Cutting/shaping (which takes 30mins to an hour) -Fine tooling which requires depending by design drilling, then 8 round, 10 round or GB threading -Skimming to smooth surface -More drilling for poll/coil Not to mention having to re-indicating when swapping from machines. Grinding/smoothing corners/edges, threads. Then Q/A for proper specs as even the slightest mistake will throw off specs. IF it passes then it is ready to move on. You really do not know the process and even a large build house will not waste 1k on that much work. Sent from my Z970 using Tapatalk [/QUOTE]
Insert quotes…
Verification
Post reply
Forum
Off-topic Discussion
The Lounge
everyone likes papermaker
Top
Menu
What's new
Forum list