theCybe 5,000+ posts
sector three
Just bought a house with an unfinished basement -- one half is empty, sixteen feet by fourty feet. Walls are block, floor concrete.
Ingredients list:
650 Projector: Mitsubishi HC-1500 (DLP, 720p) (40 hours)
100 Screen: Wilsonart DesignerWhite, 5' x 10' in Matte 60
25 HD/Blu-ray: 360 HD-DVD refurb
130 SACD and Upconverting: Oppo 981HD
400 Receiver: Onkyo tx-605/HTIB
000 Sides: Onkyo HTIB
000 Sub: Onkyo HTIB
120 Left/Right mains: Polk R50
110 Left/Right rears: Polk R30
130 Center: Polk CSi3
50 Cables, mounts: Monoprice
180 Home depot: Drywall, Tapcons, Nails, Screws, Mud, Tape, lumber
$1915 so far
-----------
Some pics:
I had to ... adjust some cabinetry that was already there.
And a closet
Consolidated cabinetry and closet.
Ingredients list:
650 Projector: Mitsubishi HC-1500 (DLP, 720p) (40 hours)
100 Screen: Wilsonart DesignerWhite, 5' x 10' in Matte 60
25 HD/Blu-ray: 360 HD-DVD refurb
130 SACD and Upconverting: Oppo 981HD
400 Receiver: Onkyo tx-605/HTIB
000 Sides: Onkyo HTIB
000 Sub: Onkyo HTIB
120 Left/Right mains: Polk R50
110 Left/Right rears: Polk R30
130 Center: Polk CSi3
50 Cables, mounts: Monoprice
180 Home depot: Drywall, Tapcons, Nails, Screws, Mud, Tape, lumber
$1915 so far
-----------
Some pics:
I had to ... adjust some cabinetry that was already there.
And a closet
Consolidated cabinetry and closet.